  • MER 비즈니스 방식에는 엔지니어링 컨설팅 / 설계, 설치 / 시운전 / 감독, 유닛 장비, 예비 부품, EPC, BOT, BOO, PPP, JV / FDI, PMC
  • MER Main Business Industries:

    1. Lime Kiln: 30~400 Ktpa active lime kiln (rotary kiln, PFR vertical kiln, burner beam vertical kilns, peripheral burner vertical kiln, annular shaft kiln); 
    2. Metal Mg Plant: 5000~30000tpa Mg project, including horizontal reduction furnace and vertical reduction furnace;
    3. Metallurgical industry:300~2500 Ktpa Pellet project,24~500m2 Sinter project, thermal engineering (reheating furnace, annealing furnace); metallurgical engineering; energy-saving unit, environment protection unit, EIC Unit, unit engineering (PCI, pneumatic conveying)
    4. Pipe Casting industry: ductile iron pipe production equipment, pure magnesium spheroidizing system, lost form casting equipment, grey cast iron pipe production equipment 
    5. Machinery industry: steel grating equipment; bending machine; CNC cutting equipment, hydraulic station 
    6. Imp. and Exp. of product and technology: Export for above equipment and technology, the relative products: CaO, PCC, Nano PCC, Ca, Mg, Mg alloy, Al2O3, various Iron & Steel and grating; NG station equipment and NG cylinders; and Import for Ore and advanced metallurgical equipment of energy saving and environmental protection
    7. Domestic and oversea mining investment: high quality calcium oxide, calcium hydroxide and Nano PCC, all Ca industry products, and other mining products






  • MER Rank in professional field:

    1. Lime Kiln: China TOP 3:  100+sets of rotary kiln, 20+ PFR vertical kiln, 100+burner beam vertical kilns, peripheral burner vertical kiln, annular shaft kiln 
    2. Metal Mg Plant: China Top 1:  10+ Mg projects with horizontal reduction furnace and 7 Mg plants with vertical reduction furnace;
    3. Metallurgical industry:China Top 5 20+ sets of Pellet project,24~500m2 Sinter project, thermal engineering (reheating furnace, annealing furnace); metallurgical engineering; energy-saving unit, environment protection unit, EIC Unit, unit engineering (PCI, pneumatic conveying)
    4. Pipe Casting industry: China Top 1 ductile iron pipe production equipment, pure magnesium spheroidizing system, lost form casting equipment, grey cast iron pipe production equipment 
    5. Machinery industry: China Top 3 in steel grating equipment; bending machine; CNC cutting equipment, hydraulic station 
    6. Imp. and Exp. of product and technology: Export for above equipment and technology, the relative products: CaO, PCC, Nano PCC, Ca, Mg, Mg alloy, Al2O3, various Iron & Steel and grating; NG station equipment and NG cylinders; and Import for Ore and advanced metallurgical equipment of energy saving and environmental protection
    7. Domestic and oversea mining investment: high quality calcium oxide, calcium hydroxide and Nano PCC, all Ca industry products, and other mining products


  • Yes, all our design are "tailer-made", every customer has their own "state-of-the-art" design, and we make the customized job for different customers
  • please fill in http://www.sinolimekiln.com/message.html or email us/ add whatsapp, thank you!
  • Generally Tianjin Xingang port, or as required
  • 다른 장비 또는 프로젝트에 따라, 우리는 사전에 수출 주문을 정렬합니다. 예 : EPC 라임 킬른 프로젝트 1 회, 기본 및 세부 설계 1 ~ 2 개월, 제작 및 선적 3 ~ 4 개월, 설치 / 시운전 4 ~ 7 개월, 점화 / 시동 1 개월.
  • 포장 및 운송

    플랜트 및 장비는 현장에서의 운송 및 보관 중 손상이나 손상을 예방할 수 있도록 적절하고 항해가 용이하도록 포장 및 보호되어야합니다.

    운송을위한 각 포장에는 그 안에 포함 된 부품을 열거하는 포장 목록의 사본이 있어야합니다. 포장 목록은 방수 페이퍼 봉투에 넣고 필요에 따라 케이스, 상자 등의 안쪽에 고정 시키거나 고정시켜야합니다.
    패키지를 열면 즉시 사용할 수 있습니다.
    케이스 포함유리와 같은 깨지기 쉬운 물질이나 섬세한 물질은 "약함 - 손질로 손질"이라고 표시해야합니다.
    예비품 및 이와 유사한 재료는 왁스 칠 종이에 포장되어야한다. 연료 펌프, 인젝터, 노즐 등과 같은 민감한 부품은 합성 물질 또는 고무 처리 된 용액에 담궈 야합니다.
  • 협상 가능한
  • 시험 및 검사 품목
    장비, 부품 및 재료는 시험 및 검사되어야하지만 다음에 국한되지는 않습니다 .


    • 재료 시험
    • 용접 검사
    • 비파괴 시험
    • 열처리 검사
    • 시각 및 치수 검사
    • 숍 어셈블리
    • 성능 검사
    • 정역학 및 공압 테스트
    • 도장 검사
    • 균형 시험
    • 기타 시험 및 검사




  • 성능 보증

    시공 완료 후 , 구매 설비 의 성능을 확인하기 위하여 예비 승인 시험 및 최종 승인 시험을하여야한다 .

    수락 시험의 보증 가치, 조건 및 절차에 대한 세부 사항은 나중에 고용주와 MER간에 논의되고 합의 되어야한다 .
    MER은 MER에서 제공 한 장비를 테스트 할 때상기 언급 된 수용 테스트의 상세한 조건 및 절차에 따라 운영되고 이에 명시된 장비 의 합의 된 성능을 충족시킬 수 있어야 한다.